Brand
|
Center
|
Size
|
24/410 200ml
|
Color
|
Any is ok
|
Material
|
HDPE,PP
|
Packing
|
Strong carton packing suitable for long-distance transport
|
MOQ
|
10,000pcs
|
Port
|
Ningbo or Shanghai
|
Delivery time
|
Within 25- 30 days after reveived deposit
|
Payment Terms
|
30% paid for deposit by T/T before production arranged, the balance to be paid before shipment.
|
Customized Process:
1st Step: Show your requirements.
2ndStep: We try to understand the conception and pattern from you with sample draft or refer picture.
3st Step: Offer the quotation after confirm the design, material and surface treatment.
4st Step: Made the sample for approval.
5st Step: Arrange production after deposit received, at the same time,give us you shipping MARK.
6st Step: Arrange shipment after receiving final payment.
7st Step: The goods are shipped.
8st Step: You receive the goods.
FAQ:
Q: How to get a quotation and start business relationship with your company?
A: Please send us email and our sales representive will contact you as soon as we receive your email.
Q: How to receive a price quotaion in the shortest time?
A: When you send us an enquiry, please kindly make sure all the details, such as model No , product size, and tube Length, color , order quantity . We will send you quota with complete details soon .
Q: How to start a custom project with your company?
A: Please send us your design drawings or original samples so that we can offer a quotation first. If all details are confirmed, we will arrange the sample making once received your deposit .
Q: What's your MOQ?
A: The MOQ depends on the design and production processes of the products. Normal our company MOQ is 50000pc , but if you could accept a little expensive price , 10000pcs is okey !
Q: What types of payment terms do you accept?
A: Normally , the payment terms we accept are T/T (30% deposit , 70% against B/L copy) and irrevocable L/C at sight.
Q:How long can I receive an order?
A: That depends on the specific items and your order quantity. Normally, the lead time for a 20ft container load will be within 30days