Auto Part in ADC12 Aluminum Alloy Die Casting

Model NO.
376
Mold
Mold Design and Fabrication
Software Applied
PRO/E, Auto CAD, Solid Work 2013, Ug
Transport Package
Carton, Environmental Pallet
Specification
Customized
Trademark
Customized
Origin
Ningbo
HS Code
7616991090
Production Capacity
100000PCS/Year
Reference Price
$ 9.28 - 9.32

Product Description

Product Description

 

Material:  ADC-12
Cavity Number: 1
Process Technology: High pressure die casting
Product Dimensions:  Customized
Casting General Tolerance: Grade GB-CT4
Surface Finish:  Polishing, Vibratory deburring,Anodizing, Power Coating, Painting,etc
Flow Processes:  Die casting, Degating, Polishing, vibratory deburring, Machining, CNC Machining by machining center, Cleaning, Powder coating, Packing, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection,  and Outgoing quality control
Inspection Equipment:  CMM, Caliper, Plug Gage,Spectrograph,Pneumatic measuring tool,etc
Application: Machinery Parts
Certificate: ISO/TS16949:2009
Lead Time 30-35 days
Trade Term: FOB Ningbo
  Auto Part in ADC12 Aluminum Alloy Die Casting Auto Part in ADC12 Aluminum Alloy Die Casting Auto Part in ADC12 Aluminum Alloy Die Casting
 
Company Profile

 

NINGBO ZHENHAI BOLANG METAL PRODUCT FACTORY was established in 2001.  BOLANG centres high precision CNC machining as our core competence, the company specializes in producing auto parts, agriculture parts, machinery parts, lighting parts, hardware fittings etc. We can provide pressure casting, sand casting, investment casting, gravity casting, the material covers aluminum alloy such as A380, A390, ADC12,YL102, A356, aluminum extrusion of 6000 series, zinc alloy, iron, copper etc.
The products are mainly exported to countries such as USA, Europe (England, Germany, Italy, Belgium etc), Asia (Japan,Korea etc). And the company has successfully passed ISO/TS16949 quality management certificate.

 
FAQ
Q1. When can I get the price?
A:  We usually quote within 2-3 days after we receive the RFQ or feedback within 2 days if any questions on prints need to be confirmed.
Q2. How long is the lead-time for mold?
A:  Usually it depends on the size and complexity of the mold. But normally, the lead time is 35-45days. 
Q3. I have no 3D drawing, how should I start the new project?
A:  You can supply us a sample, we will help work on establishing 3D model accordingly.
Q4. Before shipment, how to ensure the products quality?
A: We have strict development procedure, during samples development, we have capacity to produce according to PPA, after PSW approved,






 

 

TREF.COM.MK, 2023