Kato HD400-5-7 Swing Reduction Gearbox
Detailed Photos
Product Description
Final Drive & Swing Components for Excavators:
Planetary drive gears must withstand the high forces of torque generated by the engine and transfer these loads to move the equipment.
All BN gears and final drive gears are manufactured to precise tolerances for reliable operation. The manufacturing method includes a heat treatment process that increases bending strength, prevents case crushing and provides exceptional wear resistancefor a long service life.
DESCRIPTION:
PART NAME
|
Kato HD400-5-7 Swing Reduction
|
EQUIPMENT
|
apply to Kato HD400-5-7 EXCAVATOR
|
PART No.
|
-
|
SERIAL No.
|
-
|
STOCK CODE
|
|
MAIN SHAFT
|
12TEETH,24SPLINE
|
SPROCKET HOLES
|
-
|
CATEGORY
|
Construction Machinery Parts, Excavator Spare Parts
|
INSTALLATION
|
POWER TRAIN
|
APPLICATION
|
Replacement
|
ITEM CONDITION
|
NEW
|
LOGO
|
BN
|
MOQ
|
1 pc
|
DESCRIPTION:
1. Completely, assembly, and ready to installed in your Kato HD400-5-7 excavators.
2. Without MOTOR
3. All components are produced by us.
4. All new, undamaged.
5. Painted or Unpainted, depend on requirement
6. 90 days warranty, call or email with any questions.
7. Plywood Case Packing, free of fumigation
8. Deliver to worldwide by Sea, Air, or Carrier.
Company Profile
-
We are the manufacturer and own
18000 m
2
factory areas
, good relationship with material suppliers, which make more competitive price and steady quality.
-
We have more than
80 units
advanced facilities for production.
-
We have 8 senior engineers with more than
30 years experience
on designing and machining.
-
Our sales term offer the
efficient service
for every customers.
-
We are the
long term parts supplier
for many famous companies, such as FOSTER WHEELER POWER MACHINERY CO.,LTD and C.R.Dinly etc.
-
We develop spare parts for
old and new excavator
models, and submit our latest products to customers every month so that to meet the market demand.
-
We have
high market share
in Oversea market and Domestic market, Southeast Asia 60%,
Russia 10%,
Middle East 8%, North and South America 10%,Europe 8%, others 4%.
Certifications
1. Warranty Type:
We will replace the product which have quality problem.
2. Warranty Period:
Supply 3 months warranty for the products from the date of arrival. Customer should check the items according to the order list after arrival. Contact with us and offer the data, photos of the problem items.
3. You need to pay for the replacement charge for following condition:
* Wrong Order from customer.
* Natural Disasters cause the damage.
* Error installation.
* The machine and reducer work over time and over load.
* Lost by any condition.
* Human element destroyed.
* Corrode with rust during stock and running.
* Warranty Expired.
4. Others
They are the product easy to be rust away, please wrap them well. We just supply warranty for the products we are producing, except the Bearing, Seal, and some others we mention before order.If there is any problem about the products, installation or maintenance, please contact with us any time. We reserve the rights of final interpretation.
Packaging & Shipping
TRADE TERMS
|
EXW, FOB, CFR, CIF
|
PAYMENT TERMS
|
T/T, Western Union, Alipay, Paypal
|
PORT
|
Jiangmen
Port
, negotiation
|
LEAD TIME
|
-
Stock in hand: 4-7 days for processing and packing
-
Bulk Production: 10-35 days, depend on the quantity.
|
DELIVERY
|
By Sea, Air, Carrier
|
ORDER FLOW
|
-
Customers offer the part number, part name, model, quantity, data of items, delivery term.
-
We quote the best price according to the requirement of customers.
-
Confirm the purchase order and pay the deposit.
-
We prepare and pack the goods.
-
Customers make the payment according to the Proforma Invoice once the goods get ready for delivery.
-
We delivery the goods with the packing list, commercial invoice, B/L and other documents requested.
-
Track the transport and arrival about the goods.
-
Welcome to give us suggestion and feedback once arrival.
|