Customized Aluminum Alloy A380 A356 ADC12 Squeeze Die Casting OEM

Tolerance Grade
8
Certification
RoHS, ISO 9001:2008
Lead Time for Mold
6 Weeks
Transport Package
Bubble Bag, Cartons and Pallets
Origin
Ningbo China
HS Code
9405990000
Production Capacity
1000000 PCS Per Year
Reference Price
$ 2.70 - 3.15

Product Description

Technical parameters Aluminum alloy Parts: ADC12, A380, ADC10, 6061, etc...
Zinc alloy Parts: ZAMAK3,ZAMAK5,etc...
Aluminum alloy profile extrusion: 6061,6063, 6082, 7075
Brass alloy parts: Si9Cu3, Cuzn-37, etc......
Manufacture Process Drawing/Sample→Mould design→Mould manufacturing→Finished mould→Die casting→Deburring → Polishing→CNC Processing→Surface Finishing→ Packaging
Equipment Cold chamber die casting machine:180T/280T/350T/500T/800T/1250T
CNC centers, CNC turning, CNC lathes, electrical pulse, line cutting, milling, drilling, grinding
Surface Treatment Trimming, Deburring,Polishing, Shot blasting, Sandblasting,Tumbling, Powder coating, Anodizing, Chrome, Electrophoresis, Passivation, Chemical coating
Products Application Automotive, Electric Motor, Light, Motorcycle,Bicycle, Power tool, Telecommunication, Gas Meter, Home Appliance Equipment, Compressors, Flow Meters, Pumps, Valves, Traffic Equipment, etc.

Customized Aluminum Alloy A380 A356 ADC12 Squeeze Die Casting OEM


Customized Aluminum Alloy A380 A356 ADC12 Squeeze Die Casting OEM
FAQ
Q1:   Why choose us?
A:   We are a manufacturer with more than 10  years experience.

We have a very well-trained workers , v ery excellent QC group , W hat we provide isn't only good price, but better product quality and  s atisfactory after-sales service .
W e welcome every buyer to visit our factory to know more about us.

Q2:   How to get a quotation?
A:   we need to get specific details, such  as  drawings or samples .

Q3 : What's your lead time  ?
A:  
Mold manufacturing time:It depends on the product size and structure, usually is 5-6 weeks.
Die casting production time: according to the steps and complexity of product processing, and the quantity of the order, usually is about 4-5 weeks. 


Q4 :  How to control the quality ?
A: We have QC department, three-coordicate measuring machine, projector, high gauge etc. in mass production stage. 

 

 

TREF.COM.MK, 2023